watex.utils.geotools.lns_and_tres_split#

watex.utils.geotools.lns_and_tres_split(ix, lns, tres)[source]#

Indeed lns and tres from GeoStratigraphy model are updated.

Then splitting the lns and tres from the topped up values is necessary. Kind to resetting tres and `ln `back to original and return each split of inputting layers and TRES and the automatic rocks topped up during the NM construction.

Parameters:
  • ix – int Number of autorocks added

  • lns – list List of input layers

  • tres – list List of input resistivities values.